Scope of Project:
In the fall of 2000, Brayman completed the construction of a 230-ft long anchored soldier beam and lagging retaining wall in order to stabilize a hillside threatening a residential development. This wall consisted of 24 H-pile soldier beams, ranging in length from 31 to 38 ft., set in 30” shafts interspersed with 2,785 SF of precast concrete lagging and anchored with twenty-four 4-strand anchors. |