Rocky/Cedar Creeks Dam Stability

Location: Great Falls, SC
Owner: Duke Energy Company
General Contractor: Devine Tarbell and Associates
Value: $2,500,000
Date Complete: July 2002

 


Scope of Project:

This project called for the installation of 30 each 37-strand, epoxy coated rock anchors. Uniquely, the anchors were located at the crest of the uncontrolled spillway section of the dam. Access to the anchors was from barges and a steel deck platform constructed on the top of the spillway. Using small crawler mounted drill rigs, Brayman drilled 12” diameter boreholes and 40” diameter recesses. As with most dam anchors, stringent water tightness testing, alignment checks, consolidation grouting and re-drilling were required for each anchor. Once the borehole meets all the necessary criteria, the tendons were inserted into the boreholes using a hydraulic uncoiler. Testing of the rock anchors was performed with a 1400-ton stressing ram. At selected locations, extended lift-off tests were performed to analyze the long- term load loss associated with the rock anchors.

The project was completed both on time and under budget.

 

Download Printable PDF File of this project

Back to Lock and Dam Project List

 

 

 

 

 

 

 

 

 

 

 

 
 
©2010 Brayman Construction Corporation :: General and Specialty Geotechnical Contractors
:: 1000 John Roebling Way Saxonburg PA 16056 :: ph. 724.443.1533 :: fx. 724.443.8733 :: info@braymanconstruction.com
About Brayman :: General Contracting Division :: Foundation Division :: Steel Erection :: Employment :: Project Map