Aramark Building Addition

Location: Reading, PA
Owner: Aramark Uniform Services
General Contractor: Miller-Riemeck Group
Value: $111,000
Date Complete: January 2004

 


Scope of Project:

Brayman designed, drilled and installed 16 micropiles through Karst Limestone for a new addition. Brayman personnel performed one pile load test to verify the grout to rock adhesion. Brayman utilized an overburden drilling system to drill the piles through the Karstic Limestone.

 

 

Download Printable PDF File of this project

Back to Micropile Project List

 

 

 

 

 

 

 

 

 

 

 

 
 
©2010 Brayman Construction Corporation :: General and Specialty Geotechnical Contractors
:: 1000 John Roebling Way Saxonburg PA 16056 :: ph. 724.443.1533 :: fx. 724.443.8733 :: info@braymanconstruction.com
About Brayman :: General Contracting Division :: Foundation Division :: Steel Erection :: Employment :: Project Map