Scope of Project:
Brayman completed this design-build contract for Dick Corp. in downtown Pittsburgh. Originally, the project was designed for 36-inch diameter drilled shafts founded on bedrock. Due to access and space constraints, Brayman designed a seven inch micropile foundation directly under each column. Subsequent to pile load testing in accordance with ASTM D1143, Brayman installed the remaining production pile. |