Scope of Project:
This project consisted of the drilling, installation, and stressing of 26 high capacity vertical tiedown anchors. Brayman also installed 46 bar anchors to secure sections of the monoliths that had developed large cracks. A crane-supported hanging drill rig was used to install the bar anchors. |