Scope of Project:
Brayman installed a 3,200 sf permanent soil nail wall along State Road 315. Approximately 180 soil nails were installed. Brayman performed 4 verification pullout tests and 10 proof nail tests. Studs were attached to each nail plate to integrate the soil nail wall with the cast-in-place permanent concrete face. |