Scope of Project:
This project consisted of clearing and grubbing, installation of site drainage controls, general earthwork, on-site relocation of contaminated soil, and installation of a geo-composite clay cap over the entire site. Work also consisted of the installation of a 1,000 ft. long, 40 to 50 ft. deep soil-bentonite slurry wall. |