Meadow Park Dam

Location:Crossville, TN
Owner: City of Crossville
General Contractor: Brayman Construction Corp.
Value: $3.6 Million
Date Complete: July 2012

Brayman was contracted for the structural remediation of Meadow Park Dam to provide stability and to eliminate leakage through and under dam.

This will be achieved by:

  • Installing 6 temporary siphons to de-water and control the 270-acre reservoir

  • Installing a temporary cofferdam to work on the structure “in the dry”

  • Mechanical removal of all deleterious and damaged concrete and spall areas from the submerged face of the dam and spillways and repair or replacement of concrete in these areas

  • Installing a 225cy concrete cap

  • Filling the entire structure with shotcrete

  • Installing 51 high-capacity post-tension anchors tying the structure to the bedrock

  • Pressure grouting the entire structure to seal existing lift joints

  • Installing 2,100cy buttress downstream of the structure

Brayman also performed the removal of all construction staging, falsework, and cleaning of site.