Old Stony Creek 2Old Stony Creek Dam 1

Old Stoney Creek Dam

Location: Burlington, NC
Owner: City of Burlington, NC Water Resources Dept.
General Contractor: ASI Constructors, Inc.
Date Complete: October 2011

Brayman was subcontracted to provide specialty construction services in support of the Old Stoney Creek Dam rehabilitation project,  located in Burlington, NC.

This project consisted of installing a secant pile wall on the right abutment of the dam. The secant pile wall consisted of contiguous, interlocking columns and was constructed by installing 24 concrete-filled primary shafts at set intervals, then 25 secondary shafts were drilled between and slightly overlapped the primary shafts. A steel section was inserted and the secondary shafts were filled with concrete. Additionally, the secondaries required embedment into 10 ft of rock.