Multi-Phase Project: Phase

Nesbitt Dam

This project exemplified Brayman's ability to offer "one stop shopping" for construction services by featuring several capabilities including high capacity dam anchors, temporary shoring, and driven piling.
location
Lackawanna County
,
Pennsylvania
ESTIMATED VALUE
$3M
owner
PA American Water Company
Completion date
03/2012
general contractor
ASI Constructors Inc.
Market
Locks & Dams
Multi-Phase Project: Phase

Nesbitt Dam

This project exemplified Brayman’s ability to offer “one stop shopping” for construction services by featuring several capabilities including high capacity dam anchors, temporary shoring, and driven piling. The dam anchors included the drilling and installation of 25-each 54-strand anchors totaling 2,182-feet. Artesian conditions of consisting of up to 65-feet of hydrostatic head had to be met and overcame on the spillway. The temporary shoring entailed in-house design and installation of a wall with an exposed height of 40-feet and consisting of driven H-Pile, sheet piling, wood lagging, with 3-rows of tiebacks. Rounding out the scope of work, 124-ea H-Pile totaling 5,600-feet were driven in the existing stream bed for a new training wall.

No items found.
No items found.
Nesbitt Dam

Project Gallery

Get in Touch

Interested in Partnering or Joining Our Team? Connect with us to explore opportunities for collaboration and career growth at Brayman Construction.