Team Brayman recently remobilized to the CONSOL Bailey Mine site to begin the second half of the project which involves drilling rock dowels to support a shotcrete lining for an emergency spillway as part of a sediment pond expansion project. The team began by using a small excavator-mounted drill mast to install dowels and began hanging mesh and prepping the area for shotcrete installation.