Brayman’s work on the Ironton-Russell Bridge has been featured by ENR for the innovative and cost saving constructions methods used to achieve this custom designed 900-ft-long cable-stayed center span and two 370-ft cable-stayed side span bridge.

Read the full article on ENR.com