When a portion of the northwest wingwall collapsed, the Maryland DNR and DGS contracted with Brayman for an emergency stabilization. The remediation included salvaging the original facing stones, removing the existing bridge deck, and excavating 9 feet below deck elevation.
Projects
When a portion of the northwest wingwall collapsed, the Maryland DNR and DGS contracted with Brayman for an emergency stabilization. The remediation included salvaging the original facing stones, removing the existing bridge deck, and excavating 9 feet below deck elevation.