The project required the installation of 578 micropiles with diameters of five and one-half-inch, seven-inch, and nine and five-eights-inch, and depths ranging from 30 feet to over 100 feet.
Projects
The project required the installation of 578 micropiles with diameters of five and one-half-inch, seven-inch, and nine and five-eights-inch, and depths ranging from 30 feet to over 100 feet.
Brayman was contracted by a midstream operator to complete the micropile installation at their new gas processing Cryogenic and De-Ethanizer facility located in Washington County, PA.
Nine 5/8th inch micropiles were installed under an active high-speed rail line with no interruption to rail service.