Erected just upstream of the old bridge, the new 1096lf structure is a three-span steel haunch plate girder design carrying two lanes of traffic plus an eight-foot wide sidewalk.
Projects
Erected just upstream of the old bridge, the new 1096lf structure is a three-span steel haunch plate girder design carrying two lanes of traffic plus an eight-foot wide sidewalk.
Brayman Construction
Headquarters (Pittsburgh, PA)
1000 John Roebling Way
Saxonburg, PA 16056
724-443-1533
Southern Office
925 Fairview Road
Wytheville, VA 24382
276-335-0400
West Virginia Office
195 Rose Street
Hinton, WV 25951
304-461-4676