Brayman was recently awarded ASBI’s 2017 Bridge Award of Excellence for building the Ohio bridge with the longest concrete span ever built by ODOT.
Posts
Brayman CEO Steve Muck was joined by State and local officials from Ohio and Kentucky for a ceremonial walk across the newly connected Ironton Russell Bridge. Both groups started on their respective sides of the river and walked out to meet in the middle at the location of the closure segment. This event gave the state […]
At more than 900-feet long, the Ironton-Russell Bridge has the longest span that the Ohio Department of Transportation has ever constructed. The bridge replacement project entails the construction of a cast-in-place concrete, cable-stayed bridge over the Ohio River with structural steel approaches and reinforced concrete girder superstructure on the main span. The bridge connects the […]
Brayman Construction
Headquarters (Pittsburgh, PA)
1000 John Roebling Way
Saxonburg, PA 16056
724-443-1533
Southern Office
925 Fairview Road
Wytheville, VA 24382
276-335-0400
West Virginia Office
195 Rose Street
Hinton, WV 25951
304-461-4676