7th Street Bridge Rehab

  • Location: Pittsburgh, PA
  • Owner: Allegheny County/PennDOT
  • General Contractor: Brayman Construction Corporation
  • Estimated Value: $25.4 Million
  • Completion Date: November 2017

Brayman Construction was contracted to perform the $25.4 million rehabilitation of the 7th Street “Andy Warhol” Bridge for the Allegheny Department of Public Works. The project consisted of extensive structural steel repairs, complete replacement of the concrete bridge deck, and repainting of the entire superstructure. Close proximity to downtown Pittsburgh meant that careful planning and coordination between owner, prime contractor, and various subcontractors was needed for the timely opening of the structure.

789

Hours of Work

July 2015

Construction Date

3820 ft

Surface Area

1,800,000$

Budget