Brayman HISTORY

We Have An Excellent Reputation with Over 70 Years of Experience

Brayman Construction Corporation building

1947

The Beginning

Brayman Construction Corporation Building

Brayman Construction was founded with a staff of two.

1992

Acquisition

Brayman Construction Corporation: Heavy Civil Logo
Brayman Construction Corporation Sign

Brayman Construction is acquired and incorporated by Steve Muck and kept privately owned.

1996

Brayman expands with deep foundations and geotechnical construction solutions.

Brayman Construction Corporation: Foundations Logo
Brayman expands with deep foundations and geotechnical construction solutions

2001

Brayman expands with steel erection and fabrication capabilities. (Advantage Steel & Construction).

Advantage Steel Construction Logo

2004

USACE Charleroi Lock & Dam: Multi-year lock replacement project.

USACE Charleroi Lock & Dam: Multi-year lock replacement project.

2005

PA SR66 Apollo Bridge

PA SR66 Apollo Bridge

Recognized as PennDOT’s first ever design-build project, the Apollo Bridge included the design and construction of a five-span prestressed concrete I-beam bridge over the Kiskiminetas River in Apollo, PA.

2007

WVDOH I-64 Widening Project, Kanawha River Bridge: First segmental bridge project.

WVDOH I-64 Widening Project, Kanawha River Bridge

2008

Brayman expands with marine construction and diving capabilities (SUS).

Brayman expands with marine construction and diving capabilities (SUS).

2010

Record Setting I-64 Kanawha River Bridge Opened in WV

I-64 Kanawha River Bridge

This award winning project, located in Charleston, WV, is a cast-in-place cantilever segmental bridge.

2010 - Cont.

Prettyboy Dam Rehabilitation

Prettyboy Dam Rehabilitation

Brayman installed an underwater anchorage system consisting of underwater drilling, installation and stressing of 38 bar anchors and 12 mid-width holes.  This method is described by Dam rehabilitation experts as the first of its type in the world. Read More

2011

Dulles Corridor Metro Phase 1 Silver Line Milestone Project

Dulles Corridor Metro Phase 1 Silver Line Milestone Project

This project included the installation of 724 drilled caissons to support the elevated guideways and stations for the Dulles Corridor Metrorail Project in Fairfax County, VA.

2011 - Cont.

Bluestone Dam, Dam Safety Assurance Phase 2B

Project Dates: 05/31/2005 – 11/04/2011 Installation of 216 high capacity strand anchors. First application of directional drilling for this type of construction.

2011 - Cont.

Brayman expands with precast and specialty rebar capabilities (Brayman Precast).

Brayman Precast Logo

Brayman expands with precast and specialty rebar capabilities (Brayman Precast).

2012

Ironton-Russell Bridge: First cable-stay bridge project.

Ironton-Russell Bridge

2013

Hulton Bridge: PennDOT's first strand jacking bridge project.

Hulton Bridge

2013 - Cont.

Rodney-Staton Bridge: WV Design-Build Pilot Program.

Rodney-Staton Bridge

2015

Award-Winning Hulton Bridge Completed in Oakmont, PA

Award-Winning Hulton Bridge

A major milestone for Brayman, the steel erection for the Hulton Bridge was completed when the final 60-foot wide, 283-foot long, 1,200-ton section was strand jacked into position.

2016

Record-Setting and Award-Winning Ironton-Russell River Bridge Opened Connecting KY AND OH

Record-Setting and Award-Winning Ironton-Russell River Bridge Opened Connecting KY AND OH

The new structure took approximately four and one half years to build and was opened on November 23, 2016, providing a main route for trucking and transportation in Ohio.

2016 - Cont.

Advanced Construction Robotics founded as the robotics partner for Brayman Construction.

Advanced Construction Robotics Logo
Freedom Road

2016 - Cont.

SR 136: PennDOT's first ABC Bridge Project.

SR 136: PennDOT's first ABC Bridge Project.

2016 - Cont.

PTC Slider: PA Turnpike's first ABC Bridge Project.

PTC Slider: PA Turnpike's first ABC Bridge Project.

2017

Bluestone Dam, Dam Safety Assurance Phase 3

Bluestone Dam, Dam Safety Assurance Phase 3

Project Dates: 03/28/2011 – 02/02/2017 Construction of heavy civil concrete elements: penstock stilling basin and baffles with scour pad and exit pad, two training walls, five divider walls.

2017 - Cont.

Accelerated Bridge Construction Project Completed for PA Turnpike Commission

Work began in the Spring of 2017 on the PA Turnpike Commission’s Superstructure Replacement of WB-224B in Beaver County.

2017 - Cont.

BDR 1-17 and BDR 2-17: WVDOH/WVPA first ABC Bridge Projects.

BDR 1-17 and BDR 2-17: WVDOH/WVPA first ABC Bridge Projects.

2018

Brayman CEO Receives Award

Stephen Muck, CEO of Brayman Construction Corporation and Co-founder & CEO of TyBot, LLC

Stephen Muck, CEO of Brayman Construction Corporation and Co-founder & CEO of TyBot, LLC on receiving Engineering News-Record’s 2017 Top 25 Newsmaker Award at their April 5th ENR luncheon in NYC. This award was in recognition of his outstanding achievement in bringing TyBot™, an autonomous rebar-tying robot, to the construction industry.

2019 - Cont.

Nitro: First Brayman led joint venture project.

Brayman - Trumbull Logo
Nitro: First Brayman led joint venture project.

2020

Bluestone Dam Phase 5:

Final 9 year long phase of this USACE mega-project. It will capstone a 25 year long project for Brayman.

Bluestone Dam Phase 5

2022

Kingston Warves:

Brayman-Shoreline Joint Venture. Reconstruction of Berth 7 at Port Bustamante, Kinston, Jamaica.

Brayman Construction Corporation - Shoreline Foundation, Inc. Logo
Brayman-Shoreline Joint Venture. Reconstruction of Berth 7 at Port Bustamante, Kinston, Jamaica.

Get in Touch

Interested in Partnering or Joining Our Team? Connect with us to explore opportunities for collaboration and career growth at Brayman Construction.