Complex Heavy Civil Infrastructure
Highway / Rail Bridge Construction
Constructing durable highway and railway bridges for modern transportation.
Highway / Rail Bridge Construction
Multi-Phase Project: Phase
Norfolk Southern Partial Bridge Removal
This project consisted of shoring an existing active rail that was to remain after bridge removal.
Multi-Phase Project: Phase
North Shore Connector Aerial Structure
Completion of this project further extends Allegheny County’s Light Rail System from underneath downtown Pittsburgh and the Allegheny River to the North Shore.
Multi-Phase Project: Phase
7th Street Bridge Rehab
Brayman Construction was contracted to perform the $25.4 million rehabilitation of the 7th Street “Andy Warhol” Bridge for the Allegheny Department of Public Works.
Multi-Phase Project: Phase
PTC Slide
The project consisted of the replacement of the existing two-span adjacent box beam superstructure, with a two-span continuous composite steel plate girder bridge.
Multi-Phase Project: Phase
Norfolk Southern Lehigh Micropiles
Nine 5/8th inch micropiles were installed under an active high-speed rail line with no interruption to rail service.
Multi-Phase Project: Phase
New River Parkway
The New River Parkway is a Heavy Civil Project encompassing the construction of just over five miles of new roadway, while maintaining traffic along the New River in Hinton, WV.
Deep Foundation Drilling & Grouting
Complex Heavy Civil Infrastructure