Multi-Phase Project: Phase

DC Clean Rivers Div. 1 - Main Pumping Station

Brayman’s scope of work required installation of a secant pile excavation support system comprised of 152-each, 48-inch diameter interconnecting secant piles (12,309-LF) with depths up to 91-feet, as well as installation of 150-each, 18-inch diameter augercast piles for structure foundation support.
location
Washington
,
District of Columbia
ESTIMATED VALUE
owner
DC Water and Sewer Authority
Completion date
08/2016
general contractor
Corman Construction
Market
Industrial
Multi-Phase Project: Phase

DC Clean Rivers Div. 1 - Main Pumping Station

Brayman’s scope of work required installation of a secant pile excavation support system comprised of 152-each, 48-inch diameter interconnecting secant piles (12,309-LF) with depths up to 91-feet, as well as installation of 150-each, 18-inch diameter augercast piles for structure foundation support. The secant piles were for incorporation into the final below grade wall systems for the various process structures on the project. Drilling for the secant piles was performed using 1200mm segmental casing.

No items found.
No items found.
DC Clean Rivers Div. 1 - Main Pumping Station

Project Gallery

Get in Touch

Interested in Partnering or Joining Our Team? Connect with us to explore opportunities for collaboration and career growth at Brayman Construction.